ROAD AND RAILWAY SYSTEM

National Highway 1A

National Highway 1A

Distance: Connects directly to Du Long IP.

Spec: Large road with wide lanes - with a width of 8 meters and 3 lanes.

Maximum speed: 80-90 km/h.

North-South Expressway

North-South Expressway

Distance: 6 km through the Cam Lam - Vinh Hao intersection.

Good connectivity: reduces travel time to Ho Chi Minh City (328km) by half.

Maximum speed: 120km/h

North-South Railway

North-South Railway

Distance: 20 km away

Length: 1,726 km. Travel from Hanoi and ends in Ho Chi Minh city

AIRPORTS

Cam Ranh International Airport

Cam Ranh International Airport

Location: Khanh Hoa Province

Distance: 40 km

Passengers: 10 million annually

Cargo: 13,845 tons annually

Cam Ranh Airport is set to be upgraded by 2030, with an expected capacity of 25 million passengers and 55,000 tons of cargo per year

Tan Son Nhat International Airport

Tan Son Nhat International Airport

Location: Ho Chi Minh City

Distance: 320 km

Passengers: 34 million annually

Cargo: 412.021 tons annually

Thanh Son Airport

Thanh Son Airport

Location: Ninh Thuan Province

Distance: 20 km

Expected to be in operation after 2025

SEAPORTS

Cam Ranh Seaport

Cam Ranh Seaport

Location: Khanh Hoa Province.

Distance: 25 km.

Number of berths: 2 berths.

Water depth in front of the berths ranges from -5.5m to -13.3m.

Accommodates ships ranging from 3,000 DWT to 50,000 DWT.

Handles a variety of cargo including bulk, bagged, iron, and steel.

Vinh Tan Seaport

Vinh Tan Seaport

Location: Binh Thuan Province.

Distance: 50 km.

Number of berths: 3 berths.

Accommodates ships ranging including 2 berths for 50,000 DWT and 1 berth for 100,000 DWT.

Handles a variety of cargo including general, silo, bulk, and container.

Ca Na Seaport

Ca Na Seaport

Location: Ninh Thuan.

Distance: 45km

In the first phase, there are 2 berths. Berth 1A began operations in Q2/2022, and Berth 1B is expected to be completed and operational in June 2024.

Accommodates ships ranging from 70,000 DWT to 100,000 DWT.

Handles a variety of cargo including general, bulk, and container.

The designed annual capacity for Phase 1 is approximately 3.3 million tons.

International Ca Na Seaport began operations in Q2 2022.

Cat Lai Seaport

Cat Lai Seaport

Location: Ho Chi Minh City.

Distance: 310 km.

Number of berths: 3 berths.

Accommodates ships of up to 160,000 DWT.

Handles container cargo meeting international standards.

Cai Mep Seaport

Cai Mep Seaport

Location: Ba Ria-Vung Tau.

Distance: 320 km.

Number of berths: 2 berths.

Accommodates ships of up to 160,000 DWT.

Handles international standards cargo and goods.