Services

Industrial land for lease

Read more

Ready-to-build Warehouse

Read more

Built to Suit

Read more

THE LARGEST INDUSTRIAL PARK IN NINH THUAN PROVINCE

Du Long industrial park is the largest operating IP in Ninh Thuan province with a total area of ​​407.8 hectares. The IP boats a strategic location, attracting diverse fields of investment , and featuring advannce technical infrastructures such as electricity and an internationally standardized wastewater treatment plant.

STRATEGIC LOCATION

Du Long Industiral Park boasts a strategic location, situated along the National Highway 1A, providing convenient connectivity to a multi-modal transportation infrastructure network: road, sea, air, and railway. The transportation infrastructure is continuously developing, ensuring economic efficiency for investors.

STRATEGIC LOCATION

Khu công nghiệp Du Long có vị trí chiến lược

Infrastructure

110/22KV

Power Sub-station

24-Hour

Fire Protection & Security

Up to 15,000m3/day-night

Water Supply Plant

On-site Technical Support

Meticulous maintenance of infrastructure and utilities

Up to 12,000m3/day-night

Wastewater treatment plant

Customer Service Support

Fully support customer for pre and post investment procedure

20-52meter in width

Internal Road System

Other Living Accommodation

Living and retail accommodation for workers and expats

Investment Incentives

Land tax exemption

Land tax exemption during project implementation period

(Per Decree 142/2005/ND-CP)

Import tax exemption

Exemption from import tax on machinery and equipment forming fixed assets

(Per Decree 149/2005/ND-CP)

Investment procedure support

One stop service for investment procedure 

and operation intiation

OUR CLIENTS

TESTIMONIAL

INNOFLOW

The infrastructure of the Du Long Industrial Park, including roads, planning, and wastewater treatment facilities meets our requirements. The Du Long IP is strategically located right next to National Highway 1A, providing convenient transportation for importing raw materials from the port to the factory and exporting goods from the factory to the port. Despite being our first investment in Ninh Thuan province, we have consistently received unequivocal support from provincial leadership, the Industrial Zone Management Board, and various government departments in obtaining investment certificates and other legal procedures
Mr. Kim Jin Man
General Director
Innoflow Ninh Thuan 
Dugarco

As of now, we believe that we have all the necessary attractive conditions in terms of infrastructure, functionality, and zoning planning to guide investors quickly through the procedures, allowing them to establish their production facilities in the industrial zone.
Mr. Hoang Ve Dung
Chairman of the Board
Duc Giang Corporation (Dugarco)
INNOFLOW

The infrastructure of the Du Long Industrial Park, including roads, planning, and wastewater treatment facilities meets our requirements. The Du Long IP is strategically located right next to National Highway 1A, providing convenient transportation for importing raw materials from the port to the factory and exporting goods from the factory to the port. Despite being our first investment in Ninh Thuan province, we have consistently received unequivocal support from provincial leadership, the Industrial Zone Management Board, and various government departments in obtaining investment certificates and other legal procedures
Mr. Kim Jin Man
General Director
Innoflow Ninh Thuan 
Dugarco

As of now, we believe that we have all the necessary attractive conditions in terms of infrastructure, functionality, and zoning planning to guide investors quickly through the procedures, allowing them to establish their production facilities in the industrial zone.
Mr. Hoang Ve Dung
Chairman of the Board
Duc Giang Corporation (Dugarco)
INNOFLOW

The infrastructure of the Du Long Industrial Park, including roads, planning, and wastewater treatment facilities meets our requirements. The Du Long IP is strategically located right next to National Highway 1A, providing convenient transportation for importing raw materials from the port to the factory and exporting goods from the factory to the port. Despite being our first investment in Ninh Thuan province, we have consistently received unequivocal support from provincial leadership, the Industrial Zone Management Board, and various government departments in obtaining investment certificates and other legal procedures
Mr. Kim Jin Man
General Director
Innoflow Ninh Thuan 
Dugarco

As of now, we believe that we have all the necessary attractive conditions in terms of infrastructure, functionality, and zoning planning to guide investors quickly through the procedures, allowing them to establish their production facilities in the industrial zone.
Mr. Hoang Ve Dung
Chairman of the Board
Duc Giang Corporation (Dugarco)

Construction Density/ Height Requirement?

Construction density: ≤ 70%. Construction density depends on factory’s height and the land area as specified according to the table below QCXDVN 01:2008/BXD regarding Vietnamese standards on construction planning: 

Factory’s height (m)

Maximum construction density (%) according to the area of the land 

≤ 5.000m2

10.000m2

≥ 20.000m2

≤10

70

70

60

13

70

65

55

16

70

60

52

19

70

56

48

22

70

52

45

25

70

49

43

28

70

47

41

31

70

45

39

34

70

43

37

37

70

41

36

40

70

40

35

>40

70

40

35

What is the minimum land lease in Du Long IP and what is the land lease period?

Minimum: 10,000m2

Until 2057

Site connection of the IP?

Distance to cities, seaports, airport, railway and expressway:

- Major Cities: HCMC: 350 km, Nha Trang: 70 km, Dalat: 110 km

- Sea Ports: Cam Ranh seaport: 25 km, Ca Na seaport: 45 km, Vinh Tan seaport: 50 km

- Airport: Cam Ranh international airport: 40 km

- North South railway – Phan Rang station: 20 km

- North South Expressway – Cam Lam Vinh Hao connection point: 6 km

Are there amenities and retail services within the IP?

- Amenities in Du Long IP:

   + Eletricity:110/22KV

   + Water Supply:15.000 m3/day-night capacity

   + Drainage and Waste Water Treatment: 12.000m3/day-night capacity

   + Total land area ready to lease: 140 ha

- Retail service: available inside the IP on area of 5 ha (banks, restaurants, accomodation area for workers and experts…)

How are the tax incentives?

Accoring to IRC dated 27/04/2007 and 3rd revision dated 07/11/2022, Decree No.46/2014/NĐ-CP and Decree No. 35/2017/NĐ-CP, the tax incentives are as follows:

- Free land tax

- Corporate Income Tax Reduction: 10% in 15 years:

  • 0% for 1st 4 years since taxable income
  • 50% for the next 9 years

- Import tax exemption

Does Du Long Industrial Park have an environmental license? What are the favorable industries?

Du Long IP is granted Environmental License No. GPMT306/GPMT-BTNMT. The favorable industries are:

  • Food manufacturing and processing
  • Beverage manufacturing
  • Textile, weaving and dyeing
  • Apparel & garment  manufacturing
  • Leather and related products manufacturing
  • Wood processing and production of bamboo products
  • Paper and paper products manufacturing
  • Chemical products manufacturing
  • Pharmaceutical products manufacturing 
  • Plastics and rubber manufacturing
  • Metal manufacturing
  • Prefabricated metal products manufacturing 
  • Electronic products, computers and optical products manufacturing
  • Electrical equipment manufacturing
  • General Automobile manufacturing
  • Furnitures manufacturing
  • General Manufacturing and processing
  • Manufacturing and distribution of electricity, gas, hot water, steam and air conditioning
  • Supply of water, drainage, and wastewater 
  • Warehouse and logistics

Can Land Use Right Certificate be issued to tenants?

As prescribed by Vietnam Land Law 2013, the Lessee will be issued Land Use Right Certificate after 100% of rental fee is fully paid.

How many Ips in Ninh Thuan province?

There are 4 Ips in Ninh Thuan province:

  • Du Long IP
  • Thanh Hai IP
  • Phuoc Nam IP
  • Ca Na IP

What are the investment procedures until operation?

What is the minimum wage for workers in the province? How is overtime calculated?

  • Minimum wage for Ninh Thuan province is region 3: 3.640.000 VNĐ/month. 
  • Per Clause 98 of Vietnam Labor Code 2019, overtime is calculated as belows:
    • On normal day: 150%
    • On weekend: 200%
    • On public holidays: 300%

What are the import tax incentives on equipments and machinary?

Per Decree 87/2010/ND-CP dated 13/08/2010 regarding the Law on Import and Export Tax, investors are exempt from import tax on goods to create fixed assets. 

For used machinery and equipments, the conditions for importing machinery and equipment must apply according to Decision No. 18/2019/QD-TTg (machines’ age must not exceed 10 years or remaining performance of the machines still reaches 85% of the original design efficiency)