ROAD AND RAILWAY SYSTEM

National Highway 1A

Distance: Connects directly to Du Long IP.
Spec: Large road with wide lanes - with a width of 8 meters and 3 lanes.
Maximum speed: 80-90 km/h.

North-South Expressway 

Distance: 6 km a through the Cam Lam - Vinh Hao intersection. 
Good connectivity: reduces travel time to Ho Chi Minh City (328km) by half.
Maximum speed: 120km/h

North-South Railway

Distance: 20 km away
Length: 1,726 km. Travel from Hanoi and ends in Ho Chi Minh city

AIRPORTS

Cam Ranh International Airport

Location: Khanh Hoa Province 
Distance: 40 km  
Passengers: 10 million annually 
Cargo: 13,845 tons annually 
Cam Ranh Airport is set to be upgraded by 2030, with an expected capacity of 25 million passengers and 55,000 tons of cargo per year 

Tan Son Nhat Airport

Location: Ho Chi Minh City 
Distance: 320 km 
Passengers: 34 million annually 
Cargo: 412.021 tons annually 

Thanh Son Airport

Location: Ninh Thuan Province 
Distance: 20 km 
Expected to be operational between after 2025 

SEAPORTS

Cam Ranh Seaport

Location: Khanh Hoa Province. 
Distance: 25 km. 
Number of berths: 2 berths. 
Water depth in front of the berths ranges from -5.5m to -13.3m. 
Accommodates ships ranging from 3,000 DWT to 50,000 DWT. 
Handles a variety of cargo including bulk, bagged, iron, and steel. 

Vinh Tan Seaport

Location: Binh Thuan Province. 
Distance: 50 km. 
Number of berths: 3 berths. 
Accommodates ships ranging including 2 berths for 50,000 DWT and 1 berth for 100,000 DWT. 
Handles a variety of cargo including general, silo, bulk, and container. 

Ca Na Seaport

Location: Ninh Thuan. 
Distance: 45km 
In the first phase, there are 2 berths. Berth 1A began operations in Q2/2022, and Berth 1B is expected to be completed and operational in June 2024. 
Accommodates ships ranging from 70,000 DWT to 100,000 DWT. 
Handles a variety of cargo including general, bulk, and container. 
The designed annual capacity for Phase 1 is approximately 3.3 million tons. 
International Ca Na Seaport began operations in Q2 2022. 

Cat Lai Seaport

Location: Ho Chi Minh City. 
Distance: 310 km. 
Number of berths: 3 berths. 
Accommodates ships of up to 160,000 DWT. 
Handles container cargo meeting international standards. 

Cai Mep Seaport 

Location: Ba Ria-Vung Tau. 
Distance: 320 km. 
Number of berths: 2 berths. 
Accommodates ships of up to 160,000 DWT. 
Handles international standards cargo and goods.